The above is from October 2016 to March 2017. The double-layer titanium reactor vessel designed according to the requirements of the precious metal refining company is a lower discharge type 300L double-jacketed titanium reactor vessel. The process installation of all equipment The company is responsible for the design and installation of all equipment in the gold refining workshop and all the process pipelines in the silver electrolytic refining workshop.